Mobile
Log In Sign Up
Home > chinese-english > "pile frame" in English

English translation for "pile frame"

打椿架
打桩架
桩架


Related Translations:
piling:  n.1.打桩,打桩工程。2.桩,桩基;桩材。
carbon pile:  石墨反应堆碳堆碳柱稳压用炭棒堆
granular pile:  粗颗粒土桩
pile area:  材堆区
polypropylene pile:  丙纶绒
battered pile:  斜村斜桩
bored piling:  螺旋桩
spliced pile:  接厝拼接桩
lag pile:  加套椿加套桩套桩
pressure pile:  承压桩气压打桩压入椿压入桩
Example Sentences:
1.Pile frame - test method for performance
桩架性能试验方法
2.Classification of pile frame
桩架分类
3.Can not pile frames , dual vibratory hammer or hammer in high tonnage joint use of large diameter pile
还可以不用桩架组合,双锤或多锤在高吨位大直径管桩上联合使用。
4.It is highly reliable in pile driving : the perpendicularity of the driven pile can be ensured due to the excellent rigidity of pile frame , secure connection , low gravity centre of main machine , big grounding area and very strong stability of anti - overturning in the course of movement and pile driving
打桩可靠性高:打桩架钢性好、联接牢靠、主机重心低、接地面积大、桩机在行走移位及打桩过程中具有较强的抗倾覆稳定性,并能保证打入桩垂直度。
5.According to the special stratum condition 、 soil parameter 、 pile frame system in the protecting landslide of hongtian jianfeng in yongan city in fujian province , compile a fem program of plane strain and analyze the interaction by nonlinear fem on intensity discount . in the program , duncan - chang model is applied to earth , elasticity model is applied to pile and rock ; goodman element is set between pile and rock - earth and applied to simulate sliding plane and flexible floor ; sequential pole elements with original stress are applied to anchor cable
在程序中土体采用了duncan - chang双曲线本构模型,桩和锚固层以下的岩体采用了线弹性本构模型,并且在桩和岩土体间设置了无厚度的古德曼( goodman )单元,对于软弱夹层和已知的滑裂面也采用古德曼单元模拟,锚索采用的是具有初始应力的连续杆单元模拟。
6.To counter the main reasons of piles ' displacement and inclination , i . e . , 1 ) greater lodging after removal of pile cap ; 2 ) inclination of pile frame ; 3 ) driving into ballast course ; 4 ) obvious rolling of excavated mud surface , a set of effective measures dealing with deviation of marine driving are offered
针对其中影响桩跑位和桩倾斜的主要原因,即: 1 )起帽后桩倒伏大; 2 )桩架不垂直; 3 )碎石层上沉桩; 4 )挖泥泥面起伏大,总结出一套控制水上沉桩偏位行之有效的方法。
Similar Words:
"pile formula" English translation, "pile foundation" English translation, "pile foundation dynamic inspectl0n" English translation, "pile foundation wharf" English translation, "pile foundation work" English translation, "pile framing" English translation, "pile front edge guide" English translation, "pile geometry" English translation, "pile gloves" English translation, "pile grillage" English translation